City of Evanston Design & Project Review Committee met Wednesday, May 3.
Here is the agenda provided by the Committee:
. Call to Order/Declaration of Quorum, Scott Mangum, Acting Chair
1. 818 Lake Street Concept Review
Kiril Mirintchev, architect, submits for review of interior and exterior remodeling of an existing building with a second story mezzanine addition cantilevered over the property line in the C2 Commercial District.
2. 1916 Harrison Street Preliminary Review
Daniel Schermerhorn, owner, submits to demolish two existing structures and install at-grade parking for 10 parking spaces, including one handicap accessible space in the B1a Business District and oCSC Central Street Overlay District.
II. Approval of Minutes: April 26, 2017 DAPR Committee meeting
III. Adjournment
https://www.cityofevanston.org/home/showdocument?id=14840