City of Elgin Heritage Commission 2022 Historic Rehabilitation Grant Application Grant Review Subcommittee met April 26.
Here is the agenda provided by the subcommittee:
A. Call Meeting to Order
B. Roll Call
C. Selection of Subcommittee Chairman
D. Review of 2022 Historic Rehabilitation Grant Applications
a. Review process for assigning points to grant applications
b. 50/50 Application Review and Grant Recommendation
1. 408 Bowen Court: Rehabilitation of front porch stoop in appropriate design; replacement of front door with appropriate design; scrape and paint.
2. 159 S. Channing Street: Construction of carriage house.
3. 168 Franklin Street (TIF): Replace vinyl windows with wood windows; rehabilitation of front stoop in appropriate design; scrape and paint.
4. 11 N. Gifford Street (TIF): Installation of half-round gutters and round downspouts.
5. 560 Douglas Avenue: Rehabilitation of front porch with balustrade that is in keeping with the style of the home; installation of shutters to match historic photograph.
6. 160 Lovell Street: Rehabilitation of front stoop in appropriate design; installation of Queen Anne style door and sidelights; scrape and paint.
7. 477 Park Street: Remove non-original cedar shingles – restoration of original clapboards underneath; restore windows; new wood storm windows; replace non-original garage door with carriage style door; repair front and rear porches; replace cellar door; scrape and paint.
8. 453 N. Spring Street (TIF): Installation of half-round gutters and round downspouts; spot replace crown molding.
9. 470 E. Chicago Street: Rehabilitation of front porch including replaced of nonoriginal front porch stairs, newels, handrails and skirting with new features that match historic photograph; installation of custom made finial on top of porch roof to match historic photograph.
c. 75/25 Application Review and Grant Recommendation
1. 329 St. Charles Street: Spot replacement of deteriorated siding; recreation of missing architectural features; prep, prime and paint in 3 color paint scheme; Installation of half-round gutters. (Part 2 of Project from 2021)
E. Other
F. Adjournment
https://www.cityofelgin.org/ArchiveCenter/ViewFile/Item/7798